Skip to content
Team B5: G-Lock

Team B5: G-Lock

Carnegie Mellon ECE Capstone, Spring 2019 – Omar A, Chinedu O, Joel O

Menu

Month: May 2019

Status Report #9

Status Report #9   Joel :   Once we got the door to camus our next problems was fixing the issue that came when transporting. We broke some of the frame off and weren’t able to properly stand the door

cio May 7, 2019 Uncategorized No Comments Read more

Status Report #11

Status Report #11   Joel:   The last part of our project was to make sure that there were no false positives from our neural network. This would be a bit difficult since we only trained our network to recognize

cio May 7, 2019 Uncategorized No Comments Read more

Status Report #10

Status Report #10   Joel :   Finally putting the neural network on the Pi and completely integrating to see what would happen was an entire process. In fact, just to install tensorflow on the raspberry Pi was a huge

cio May 7, 2019 Uncategorized No Comments Read more

Status Report #8

Status Report #8   Joel: We needed to finally get our door from home depot back to our house in order to finally work on it. This was a harder process than we thought it would be. Our plan was

cio May 7, 2019May 7, 2019 Uncategorized No Comments Read more

G-Lock Demo Video

Check out a demo of our G-LOCK! Three features are shown in the demo: 1.Face Recognition unlock fail for non-resident 2.Face Recognition unlock success for resident 3. Keypad unlock 4. WebApp Demo and RPC Unlock Enjoy!

cio May 7, 2019May 7, 2019 Uncategorized No Comments Read more

Design Review Slides and Design Document

Design Review SlidesL Design Presentation Slides Design Document Draft: Design Document Draft

cio May 7, 2019May 7, 2019 Uncategorized No Comments Read more

Archives

  • May 2019
  • April 2019
  • March 2019
  • February 2019

Meta

  • Log in
Copyright © 2025 Team B5: G-Lock. All rights reserved. Theme Spacious by ThemeGrill. Powered by: WordPress.