Status Report #5

Chinedu Ojukwu In this past week, I was able to focus on building the hardware prototype for the Electric strike circuit and connecting sensor components via the RasPi GPIO pins. The electric strike was connected by connecting the strike to

cio March 24, 2019 Uncategorized No Comments Read more

Status Report #3

Joel Osei This week for capstone we focused on our design and completing both the presentation and the document. This required a lot of talking and figuring out the fine details on how things would work for the G.Lock. Early

cio March 3, 2019 Uncategorized No Comments Read more