{"id":60,"date":"2019-03-03T03:25:56","date_gmt":"2019-03-03T03:25:56","guid":{"rendered":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s19-teamab\/?p=60"},"modified":"2019-03-03T03:46:05","modified_gmt":"2019-03-03T03:46:05","slug":"status-report-2-24-3-2","status":"publish","type":"post","link":"https:\/\/course.ece.cmu.edu\/~ece500\/projects\/s19-teamab\/2019\/03\/03\/status-report-2-24-3-2\/","title":{"rendered":"Status Report (2\/24-3\/2)"},"content":{"rendered":"<h1>Team Report<\/h1>\n<p><span style=\"font-weight: 400\">Changes to schedule:<\/span><\/p>\n<p><span style=\"font-weight: 400\">We\u2019re catching up and for the most part maintaining the pace that we set over the past few weeks. We accounted for a reasonable amount of time spent this week towards the design reviews, so we don\u2019t have any current changes to our schedule. <\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400\">Major project changes:<\/span><\/p>\n<p><span style=\"font-weight: 400\">At this point we don\u2019t have any major project changes since we\u2019ve just finalized our project design for the most part. We still have some concerns about the DSP pipeline mapping correctly onto the DSP slices, and that\u2019s something we\u2019ll keep in mind and re-evaluate after implementing the first stage of the pipeline.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><strong>Brandon:<\/strong><\/p>\n<p><span style=\"font-weight: 400\">2\/24-3\/2<\/span><\/p>\n<p><span style=\"font-weight: 400\">For the third week of work on the project, we mainly focused on the design aspect of the project, as we had to present a design presentation as well as write a design document. Since I was presenting, I mainly had to focus on this process rather than spend a lot of time working on the actual project. Thus, I didn\u2019t make as much progress as I was hoping to make this week on video streaming functionality. However, I was able to get OpenCV to work so now I\u2019m at about 50% completion on the video streaming tests before we get the actual hardware. Speaking of the hardware, I also submitted the order form for three Raspberry Pi W with Camera Packs (see below), which we will be able to start working with once we receive them. Some technical challenges I was able to overcome included some weird UDP behavior over multiple machines, and simply installing and working with OpenCV. The steps I took to accomplish this was again, a lot of online research and various forms of testing.<\/span><\/p>\n<p><span style=\"font-weight: 400\">I\u2019m still behind schedule, since I devoted most of my time this week to the design aspect of the class, but I should be okay, because I\u2019m planning on staying in Pittsburgh over spring break, so I\u2019ll be able to catch up on anything I don\u2019t finish then (currently, I don\u2019t have anything scheduled on the Gantt chart, so it\u2019ll be an opportunity to catch up). The deliverable I hope to achieve in this next week is still getting video streaming\/sending functionality working completely.<\/span><\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"alignnone wp-image-61\" src=\"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s19-teamab\/wp-content\/uploads\/sites\/34\/2019\/03\/Screen-Shot-2019-03-02-at-10.20.36-PM-300x133.png\" alt=\"\" width=\"392\" height=\"174\" srcset=\"https:\/\/course.ece.cmu.edu\/~ece500\/projects\/s19-teamab\/wp-content\/uploads\/sites\/34\/2019\/03\/Screen-Shot-2019-03-02-at-10.20.36-PM-300x133.png 300w, https:\/\/course.ece.cmu.edu\/~ece500\/projects\/s19-teamab\/wp-content\/uploads\/sites\/34\/2019\/03\/Screen-Shot-2019-03-02-at-10.20.36-PM-768x342.png 768w, https:\/\/course.ece.cmu.edu\/~ece500\/projects\/s19-teamab\/wp-content\/uploads\/sites\/34\/2019\/03\/Screen-Shot-2019-03-02-at-10.20.36-PM-1024x456.png 1024w, https:\/\/course.ece.cmu.edu\/~ece500\/projects\/s19-teamab\/wp-content\/uploads\/sites\/34\/2019\/03\/Screen-Shot-2019-03-02-at-10.20.36-PM.png 1814w\" sizes=\"(max-width: 392px) 100vw, 392px\" \/><\/p>\n<h2>Ilan:<\/h2>\n<h3><span style=\"font-weight: 400\">Personal accomplishments this week:<\/span><\/h3>\n<ul>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Started working on bringing up FPGA and ARM core. Still working on finalizing infrastructure and toolchain so it works for all 3 of us.<\/span>\n<ul>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Had to work through temporary obstacle of powering board since we didn\u2019t have a power supply, so we ordered one for ourselves as well as one for another team that wanted one.<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Future work involves finishing bring-up, pushing infrastructure up to GitHub, and documenting toolchain for Brandon and Edric.<\/span><\/li>\n<\/ul>\n<\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Continued researching steps of Canny edge detection in more depth with Edric to prepare for design review, but we weren\u2019t able to finalize DSP slice allocation for each stage. This was brought up as a flaw in our design review documentation, so we put some time toward this during the second half of the week and will be finalizing that as well as hopefully a clock frequency target for the design that we can include in our design report. We\u2019re still trying to work through the algorithm and better our understanding which has been a bit of a challenge.<\/span>\n<ul>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Future work will be finalizing the DSP slice allocation and determining target clock frequency.<\/span><\/li>\n<\/ul>\n<\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">No progress yet on implementing interface functionality, but that\u2019s scheduled for the upcoming 2 or so weeks, so that\u2019s fine.<\/span><\/li>\n<\/ul>\n<h3><span style=\"font-weight: 400\">Progress on schedule:<\/span><\/h3>\n<ul>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Edric and I continued to make progress on understanding the algorithm and designing the pipeline. We\u2019ll be finalizing this over the rest of the weekend and the implementation will start over the next week or so.<\/span><\/li>\n<\/ul>\n<h3><span style=\"font-weight: 400\">Deliverables next week:<\/span><\/h3>\n<ul>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Finish enabling ARM core and FPGA functionality and pushing toolchain up to GitHub and documenting setup.<\/span><\/li>\n<li style=\"font-weight: 400\">Finalized DSP slice allocation and target clock frequency.<span style=\"font-weight: 400\"><\/span><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Team Report Changes to schedule: We\u2019re catching up and for the most part maintaining the pace that we set over the past few weeks. We accounted for a reasonable amount of time spent this week towards the design reviews, so we don\u2019t have any current changes to our schedule. &nbsp; Major project changes: At this &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/course.ece.cmu.edu\/~ece500\/projects\/s19-teamab\/2019\/03\/03\/status-report-2-24-3-2\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Status Report (2\/24-3\/2)&#8221;<\/span><\/a><\/p>\n","protected":false},"author":99,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/course.ece.cmu.edu\/~ece500\/projects\/s19-teamab\/wp-json\/wp\/v2\/posts\/60"}],"collection":[{"href":"https:\/\/course.ece.cmu.edu\/~ece500\/projects\/s19-teamab\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/course.ece.cmu.edu\/~ece500\/projects\/s19-teamab\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/course.ece.cmu.edu\/~ece500\/projects\/s19-teamab\/wp-json\/wp\/v2\/users\/99"}],"replies":[{"embeddable":true,"href":"https:\/\/course.ece.cmu.edu\/~ece500\/projects\/s19-teamab\/wp-json\/wp\/v2\/comments?post=60"}],"version-history":[{"count":3,"href":"https:\/\/course.ece.cmu.edu\/~ece500\/projects\/s19-teamab\/wp-json\/wp\/v2\/posts\/60\/revisions"}],"predecessor-version":[{"id":64,"href":"https:\/\/course.ece.cmu.edu\/~ece500\/projects\/s19-teamab\/wp-json\/wp\/v2\/posts\/60\/revisions\/64"}],"wp:attachment":[{"href":"https:\/\/course.ece.cmu.edu\/~ece500\/projects\/s19-teamab\/wp-json\/wp\/v2\/media?parent=60"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/course.ece.cmu.edu\/~ece500\/projects\/s19-teamab\/wp-json\/wp\/v2\/categories?post=60"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/course.ece.cmu.edu\/~ece500\/projects\/s19-teamab\/wp-json\/wp\/v2\/tags?post=60"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}