Jerry’s Status Report for 11/7

Accomplishments this week

This week I profiled the full bench workflow on the Jetson using the V17 equipment model. The median check took 469 ms on the GPU versus 5.44 seconds on the CPU, with matching bench states on the development frames. This makes the GPU path practical for our intended once per second bench checks. I also tested departure and return footage and found a case where the workflow missed someone who was partly out of frame, showing that camera placement and person association still need improvement.

For integration, I checked that the shared staff dashboard produced an inspection request after a controlled 5 min timer test and closed it on return. The bench workflow also delivered all its scheduled checks during the 15 min combined replay with the treadmill and rack workflows. Six bench checks took longer than 1 second, so we still need to examine timing under sustained combined load.

For interim demo preparation, we tested and recorded the bench workflow through the live camera and dashboard. During the 224 second recording, all 212 delivered checks finished within 1 second, averaging 373ms. The recording showed attendance, waiting after departure, a staff inspection request, and clearance after the plates were removed.

The live recording used a clearly labeled 60 second test timer rather than the production 5 min value. It also exposed limitations such as uncertain person detections paused the absence counter and uncertainty during return closed the request before attendance recovered. This gives us a useful demonstration of the complete path but does not establish reliable return handling or 5min live behavior.

Schedule status

The bench workflow is running on the Jetson and feeds the shared staff service. We now have recorded evidence for the interim demo and measurements from both individual live operation and combined replay. Broader accuracy testing and full 5 min live-event validation remain unfinished. My next focus is polishing the dashboard, improving the difficult person detections, and checking the complete workflow during longer live runs.

Deliverables for next week

  • Polish the dashboard and rehearse the bench portion of the interim demonstration.
  • Improve partial-person detection and evaluate camera placement.
  • Test departures, returns, and plate removal through the dashboard, including a full 5 min unattended event.
  • Measure bench timing, skipped checks, and observation freshness during longer combined live runs.
  • Keep demonstration results separate from held-out accuracy and final acceptance testing.

Harry’s Status Report For 11/7

Accomplished

This week I finished profiling the squat-rack workflow on the Jetson. The belongings detector was taking up most of the check, so I moved Grounding DINO Tiny to TensorRT FP16 and reduced the cost of camera alignment. On four recorded development clips, the median time for a full rack check went from 995 ms to 449 ms, and the 95th percentile went from 1,107 ms to 463 ms. Board RAM peaked at 3.67 GB in the optimized run.

I verified that the speedup preserved rack state accuracy on the same clips. I helped write the scheduler, integrate all three workflows on the Jetson, and test the setup in person. In the combined replay, every completed rack check finished within its one-second period, meeting the rack’s 1 Hz timing target for those checks.

I also helped prepare the interim demo slides.

Schedule status

The rack optimization and combined Jetson validation are on schedule for the interim demo. We finished the team demo video.

Deliverables for next week

  • Finish the interim demo slides.
  • Update the Gantt chart with our progress and remaining tasks.
  • Run longer, more thorough live tests with all three workflows on the Jetson. Measure rack accuracy and latency throughout the run and verify both against the design requirements.

Team’s Status Report For 11/7

Progress this week

After finishing the scheduler and integrating all three workflows on recorded video, we moved on to live testing. All three ran together for 15 minutes on recorded inputs without inference errors. In the gym, the stations were too far apart to connect all three to one Jetson with our wired cameras.

For the interim demo video, we filmed the treadmill and squat rack live, covering the planned scenarios and state changes for both. We set the rack alert wait to one minute for filming so the video could show the full sequence. We then tested the in-person setup using a walking pad for the treadmill workflow. It passed all our demo checks and is ready to show live.

Risks and responses

Testing all three workflows together on live cameras is the next step. We plan to use wireless cameras to cover the distance between stations and will check accuracy and update delays with all three running.

Design changes

We switched rack belongings inference to TensorRT FP16, sped up treadmill alignment, and gave each workflow its own scheduler worker. The design still uses a five-minute staff alert threshold.

Schedule

Before the interim demo, we’ll finish the slides, update the Gantt chart, and practice the presentation. After the demo, we’ll run longer, more rigorous tests with all three workflows live on one Jetson and verify accuracy and latency against the design requirements.

Jerry’s Status Report for 10/31

Accomplishments this week
This week I continued reviewing the bench workflow’s alignment and plate-association behavior on additional views and difficult plate configurations. I focused on distinguishing plates attached to the working bar from nearby storage and associating a visible person with the correct bench. The improvement reported last week remains limited to the evaluated footage, so broader reliability still needs testing.

I also got the bench workflow running from a live camera feed on the Jetson after working through the dependencies and recorded-video tests. The workflow now processes frames as they arrive from the camera. I began examining processing time and memory usage, including the cost of the individual perception steps and the complete bench check.

For integration, I worked on passing bench observations into the shared station state and timer path. The observations need to retain their timestamps and uncertainty so that delayed or missing checks do not leave an outdated state on the display. Live bench inference is running, but the complete camera to tablet path has not yet been validated.

Schedule status
Moving to live camera input advances the hardware work planned last week. Bench reliability, full unattended-event testing, and shared integration remain unfinished, and we are still behind the earlier integration plan.

Next week I will focus on connecting the live bench check to the shared application and running it alongside the other workflows. I will also continue reviewing errors that affect the complete station state, especially person to bench association and plates on the working bar.

Deliverables for next week
    •    Connect live bench observations to the shared timers and tablet display.
    •    Run the bench workflow with the live rack and treadmill checks on the Jetson.
    •    Measure processing time, memory usage, and observation freshness under combined load.
    •    Review remaining failures on additional bench views.
    •    Test departure, return, and plate-removal sequences through the application.

Alan’s Status Report for 10/31

Accomplished
This week I moved the treadmill workflow from recorded footage to a live camera feed on the Jetson. The board now processes incoming camera frames and updates treadmill states while the camera is running.
– Live input: I used recorded-video runs first to check the deployment, then switched to the camera. This let me examine capture and processing together, including whether the workflow keeps up with incoming frames.
– Performance: I began profiling memory usage, per-check processing time, and throughput. I also looked at the parts of the update delay separately. Capture, sampling, inference, and voting all contribute, so timing the pose model alone would not tell us how quickly a live change is detected.
– Difficult views: I continued checking cases where someone is partly hidden by the console or standing beside the belt. These cases also matter when evaluating lower resolution or frame skipping. I have not adopted either as the final configuration because we still need to compare their accuracy and delay.
Schedule status
Live treadmill inference is now running on the Jetson. The remaining integration work is getting those live states onto the tablet and checking performance while the rack and bench workflows run on the same board.
Next week I’ll prioritize the combined run and measure the time from a live step-on or step-off event to the corresponding tablet update. That will give us a measurement of the complete path before the interim demo.
Deliverables for next week
– Run all three live workflows together on the Jetson with Harry and Jerry.
– Measure step-on and step-off delay through the tablet display.
– Compare processing time and observation freshness when running alone and under combined load.
– Check blocked views and camera interruptions.
– Evaluate lower-resolution or frame-skipping changes against the current configuration.

Team’s Status Report For 10/31

Progress this week

This week we got all three workflows running individually with live camera input on the Jetson. Each can now capture and process incoming frames rather than rely on saved video. We have not yet run all three together or completed the live camera-to-tablet path.

Harry filmed longer rack videos for offline testing before moving to the live feed, then began profiling memory usage, latency, and throughput. Alan got the treadmill workflow running live and started checking processing speed and update delay, including the effects of sampling and voting. Jerry moved the bench workflow to live input, continued testing camera alignment and plate association, and worked on connecting observations to the shared timers and display.

Risks and responses

Running all three workflows together is still our biggest technical risk. The individual runs give us a starting point, but we need to see how processing time and memory use change under the combined workload. If it is too slow, we will first reduce unnecessary model calls or stagger station checks. Lower resolution and optimized models are other options, but we will check their effect on accuracy before adopting them.

We also need to make sure live processing does not fall behind the camera. Next week we will measure observation age through the tablet path and check that stale or disconnected inputs show unknown.

Bench accuracy and full five-minute unattended events still need more testing. We also need footage kept separate for final evaluation. UC recording permission remains pending, so we are continuing to use the apartment gym.

Design changes

There were no major design changes this week. Live camera input was part of the existing plan. We will use the combined Jetson measurements to decide whether we need changes to model settings or how often stations are checked.

Schedule

Individual live inference is now running, but combined operation and the tablet connection are still behind our earlier plan.

  • Week of November 2: run all three live workflows together, measure combined performance, and connect their outputs to the tablet.
  • Before the November 9/11 interim demo: measure camera-to-tablet delay, test camera interruptions, and rehearse the demo.
  • After the interim demo: fix remaining integration problems and complete longer unattended-event and held-out accuracy tests.

Harry’s Status Report For 10/31

Accomplished

This week I filmed longer squat-rack videos and tested them offline on the Jetson before moving the workflow to a live camera feed. Our earlier clips were useful for checking individual states, but the longer recordings gave me more continuous activity to review and repeat while testing.

After the offline tests, I got the rack workflow running directly from the camera on the Jetson. It now captures and processes incoming frames rather than reading from a saved video. I focused on whether inference keeps up with the feed and whether the observations used to update the rack state are still current.

I also began profiling memory usage, per-check latency, and throughput during these runs. These measurements give us an individual baseline before we combine the rack workflow with the treadmill and bench checks. Live inference is now running, but the full camera-to-tablet path and five-minute unattended scenario still need testing.

Schedule status

The live camera feed completes the next deployment step after last week’s offline Jetson run. Profiling is underway, but we still have not completed a combined three-workflow test or connected the full live path to the tablet, so integration remains behind our earlier schedule.

Next week I will prioritize the shared Jetson run with Jerry and Alan. I will compare the rack’s individual measurements with its performance under the combined workload and help address any processing delays before the interim demo.

Deliverables for next week

  • Run the live rack workflow alongside the treadmill and bench workflows on one Jetson.
  • Compare individual and combined memory usage, latency, and throughput.
  • Connect live rack observations to the tablet display.
  • Test a full five-minute unattended scenario and a return before the timer expires.

Team Status Report for 10/24

Progress this week

This week we worked through the design report feedback and began moving our workflows onto the Jetson Orin Nano. Each of us revised our part of the design to make system behavior and testing procedures clearer, and to separate measured
Harry got the squat-rack workflow running on the Jetson with recorded video. It reached the same accuracy as on the laptop, so it is the first of our workflows to run end to end on our intended hardware. Jerry continued improving the bench workflow, focusing on camera-view alignment and matching plates to the correct working bar. On the evaluated footage, his changes resolved 9 loading decisions that the bench workflow previously could not decide, without adding any incorrect ones. He also looked at cutting unnecessary rack model calls and began preparing model dependencies for the Jetson. Alan set up the treadmill pose model on the Jetson, revised the treadmill behavior based on the feedback, and explored ways to reduce update delay. Alan and Jerry also tested difficult treadmill views together.

We have not yet run all three workflows together on one Jetson or completed a live camera-to-tablet test.

Risks and responses

Running all three workflows on one Jetson is still our largest technical risk. Harry’s offline run shows that at least one workflow keeps its accuracy on the board, but we still have no measurements of memory, latency, or throughput, either for each workflow alone or for all three together. Next week each of us will profile our own workflow on the Jetson, and then we will run all three together. If the combined workload misses our update targets, these are our backup plans:

  • Check each station less often, or stagger the checks so the stations take turns.
  • Use lower input resolution or frame skipping. Alan is already testing these for the treadmill.
  • Reduce model calls where possible. Jerry is already doing this for the rack.
  • Switch to smaller or optimized models if the steps above are not enough.

Bench accuracy is still the weakest of the three checks. The recent improvements are limited to the footage we evaluated and do not show general reliability yet. Jerry will test them on more views and harder plate configurations next week. If bench accuracy stays low, we will have the bench check return unknown more often rather than give wrong answers, because incorrect alerts cost users more than unknown readings.

Live camera behavior is a new risk now that we are on hardware. Processing could fall behind incoming frames, which would make statuses stale. We will measure this directly in the live tests.

We still need longer recordings and more footage set aside for final evaluation, especially for the five-minute unattended wait on the rack. Confirmation for recording at the UC gym is still pending, so for now we are relying on the apartment gym.

Design changes

We did not make a major change to the system design this week. The feedback revisions made the requirements and testing procedures more specific without changing the block diagram or system spec. The update-delay and model-call reductions are still being tested locally. If we adopt any of them, we will report the change and its accuracy cost once we have Jetson measurements.

Schedule

Moving to hardware is behind our earlier plan. The design report revisions took time this week, and only the rack workflow has run on the Jetson so far. Our updated near-term schedule:

  • Week of October 26: run each workflow on the Jetson with recorded footage and then a live camera, and measure memory, latency, and throughput for each.
  • Week of November 2: run all three workflows together on one Jetson, measure combined performance, and apply the backup plans above if needed.
  • After that: complete the live camera-to-tablet path for the interim demo.

Alan’s Status Report for 10/24

Accomplished

I started this week by going through the design report feedback that applies to the treadmill workflow. I made the treadmill behavior more specific: when a reading counts as unknown, what starts and stops the unattended timer, and how we separate measured laptop results from planned Jetson behavior. Some feedback asked for clearer justification of using a pose model instead of simpler image methods. To answer it, I wrote up the comparison I ran before the report and explained how the delay in the pose model’s updates affects how fresh the treadmill status is.

I also began moving the treadmill workflow onto the Jetson Orin Nano. I set up the environment and dependencies for the pose model and started running it on recorded treadmill footage. The aim is to confirm that the board gives the same results as the laptop before testing with a live camera. Alongside this, I looked at ways to reduce the update delay, including skipping frames and lowering the input resolution, so we have options ready if the treadmill check turns out too slow on the Jetson.

I also worked with Jerry on hard treadmill views, such as a person partly blocked by the console or standing next to the treadmill instead of on it. In those cases the workflow should return an unknown reading rather than a confident wrong answer.

Schedule status

Setting up the Jetson is progress on the hardware work we planned for the week of October 19. However, I have not finished running the treadmill workflow on the board, and live-camera testing and integration are still behind our earlier schedule. I also have no performance measurements on the Jetson yet.

To catch up, next week I will first get the treadmill workflow running on recorded footage on the Jetson and measure it, then move to a live camera. Harry and Jerry are doing the same for their workflows, so all three of us will have individual baselines before we run everything together.

Deliverables for next week

  • Run the treadmill workflow on the Jetson with recorded footage and confirm it matches the laptop results.
  • Measure memory usage, per-check latency, and throughput, and check whether the update delay still meets our freshness target.
  • Run the treadmill workflow with a live camera feed on the Jetson.
  • Keep testing difficult treadmill views and confirm that unclear cases return unknown.
  • Work with Harry and Jerry to run all three workflows together on one Jetson and measure their combined performance.

Harry’s Status Report For 10/24

Accomplished

I started this week by reviewing the design report feedback and working on incorporating it into my squat-rack design. I also got the squat-rack setup and detection workflow working on the Jetson using offline video. This gives me a working starting point on our intended hardware. I was able to achieve the same model accuracy as the laptop deployment, which was expected, but it was a good sanity check.

The next step is to test the workflow with frames arriving continuously from a camera. I still need to establish whether live inference keeps up with our intended checking rate. I will also profile memory usage, latency, and throughput so we have actual measurements to use when planning the combined workload.

Schedule status

The offline Jetson run completes part of the hardware work planned in my last report. However, profiling remains unfinished, and live-camera testing and integration are still behind our earlier schedule. We have not yet run all three workflows together on one Jetson.

To catch up, I will prioritize the live rack test and individual performance measurements next week, then work with Jerry and Alan on a combined run. Measuring each workflow separately will give us a baseline for identifying any slowdown or memory pressure when they run together.

Deliverables for next week

  • Run the squat-rack workflow with a live camera feed on the Jetson.
  • Measure memory usage, per-check latency, and throughput, including whether live processing falls behind incoming frames.
  • Continue incorporating the design report feedback into the rack workflow and testing plan.
  • Work with Jerry and Alan to run all three workflows together on one Jetson and measure their combined performance.