Team Status Report for 11/9

What are the most significant risks that could jeopardize the success of the project? How are these risks being managed? What contingency plans are ready?

We still have the risk of system integration as we are all having success with our individual parts of the project, but we haven’t spent much time integrating them and seeing if there are any weird bugs or edge cases. This can be mitigated by starting to to integration soon so we have ample time before the interim and final demo to make sure our system is stable and reliable.

Were any changes made to the existing design of the system (requirements, block diagram, system spec, etc)? Why was this change necessary, what costs does the change incur, and how will these costs be mitigated going forward?

No changes made.

 