What are the most significant risks that could jeopardize the success of the project? How are these risks being managed? What contingency plans are ready?
The risks to the project as similar to what they are before. We are planning to have a basic demo prepared for the musicians on Wednesday. From this demo we will try to see how much the imperfect accuracy of each component effects the overall systems ability to provide feedback and adjust the specifics of the system accordingly. A contingency plan if adjustments don’t fix the issues would be to simplify the pieces played to pieces where we know we can have a high accuracy for.
Were any changes made to the existing design of the system (requirements, block diagram, system spec, etc)? Why was this change necessary, what costs does the change incur, and how will these costs be mitigated going forward?
Changes made: None