What are the most significant risks that could jeopardize the success of the project? How are these risks being managed? What contingency plans are ready?
The most significant risks that jeopardize the success of the project is having the timing algorithm not work correctly. This risk is being managed by collecting a lot of music audio to ensure we can have a working algorithm for the demo. A contingency plan is to limit the scope of the project to music that is easier to break down if we find having support for all music to be too complex.
Were any changes made to the existing design of the system (requirements, block diagram, system spec, etc)? Why was this change necessary, what costs does the change incur, and how will these costs be mitigated going forward?
There are no changes to the design of the system at this time.
Provide an updated schedule if changes have occurred.
No schedule changes at this time.