Team Status Report for 10/1/22

This week we have been working on the design presentation, as Mae and Serena work out software implementation and Meghana on robot hardware. We have two main changes to our project based on the discussions with Tamal this week. Instead of building a robot from scratch, we are going to Read more…

By maez, 3 years ago
Meghana's Status Reports

Meghana’s Status Report for 10/01/22

This week after speaking with Tamal, we decided to pivot away from building a robot from scratch and using an iRobot as a base instead. In the beginning I was struggling with mounting on the iRobot and it being more restricted, but then came around to the idea after more Read more…

By mkeeta, 3 years ago
Serena's Status Reports

Serena’s Status Report for 10/1/22

This week, we made an important modification to our project as a team— after speaking with Professor Mukherjee, we decided to use an iRobot as our base rather than building a robot from scratch.    Mae and I then worked on refining the pipeline for our software system, based on Read more…

By sjying, 3 years3 years ago
Weekly Status Reports

Team Status Report for 9/24/22

This week and the ending of last week were crucial towards the development of our project, tasks and schedule. We brainstormed and prepared for the Project Proposal Presentation. We also put together the slides and spent a lot of time discussing and breaking down our schedule. We also were able Read more…

By maez, 3 years ago
Serena's Status Reports

Serena’s Status Report for 9/24/22

This week, Mae, Meghana, and I all worked on completing the Project Proposal Slides by solidifying our scope and laying out our requirements, tools, challenges, solution, and timeline. I rehearsed giving the speech so that I could deliver it adequately. I also worked with Mae to walk through our current Read more…

By sjying, 3 years3 years ago
Meghana's Status Reports

Meghana’s Status Report For 9/24/22

In the beginning of the week, Mae and I helped Serena with the Project Proposal Slides. During the slide preparations I made a rough Figma design of what the robot will look like. In the upcoming week I plan to fully CAD the design to understand the practicality of it Read more…

By mkeeta, 3 years3 years ago
Mae's Status Reports

Mae’s Status Report for 9/24/22

This week Serena and I worked out the high level software diagram for our system. We thought about the sequence of calculations, from using the machine learning model for inference to calculating the distance between the robot and target with the lidar camera to sending angle and distance commands. We Read more…

By maez, 3 years3 years ago

Posts navigation

Previous 1 … 3 4
Recent Posts
  • Serena’s Status Report for 11/10/22
  • Team Status Report for 12/10/22
  • Mae’s Status Report for 12/10/22
  • Meghana’s Status Report for 12/10/22
  • Meghana’s Status Report for 12/3/22
Recent Comments
    Archives
    • December 2022
    • November 2022
    • October 2022
    • September 2022
    Categories
    • Mae's Status Reports
    • Meghana's Status Reports
    • Serena's Status Reports
    • Uncategorized
    • Weekly Status Reports
    Meta
    • Log in
    • Entries RSS
    • Comments RSS
    • WordPress.org
    • Design Review
    • Final Project Documents
    • Introduction and Project Summary
    • Proposal
    • Weekly Status Reports
    Hestia | Developed by ThemeIsle