Team A4: Recycle Queen Robot
  • Introduction and Project Summary
  • Weekly Status Reports
  • Proposal
  • Design Review
  • Final Project Documents

October 2022

Mae's Status Reports

Mae’s Status Report for 10/8/22

This week we all worked on the design review presentation and I presented in the design review. With the introduction of obstacles, I modified the dataset to have all non-plastic bottle items be in the “obstacle” class. I trained the model on the new dataset annotations and got good results. Read more…

By maez, 3 years3 years ago
Meghana's Status Reports

Meghana’s Status Report for 10/08/22

After the last status update last weekend, I CADed the basic parts of the robot. Below are pictures of the CADed robot from different angles. While I was CADing the robot, I also had to figure out exactly what parts to use and do research on one part over another. Read more…

By mkeeta, 3 years3 years ago
Mae's Status Reports

Mae’s Status Report for 10/1/22

This week Serena and I worked out more details of the software system, since we decided to add obstacles and obstacle avoidance to our use case requirements. We plan to add an obstacle class to the detection model and implement OpenCV object tracking so that our LiDAR can distinguish which Read more…

By maez, 3 years3 years ago
Weekly Status Reports

Team Status Report for 10/1/22

This week we have been working on the design presentation, as Mae and Serena work out software implementation and Meghana on robot hardware. We have two main changes to our project based on the discussions with Tamal this week. Instead of building a robot from scratch, we are going to Read more…

By maez, 3 years ago
Meghana's Status Reports

Meghana’s Status Report for 10/01/22

This week after speaking with Tamal, we decided to pivot away from building a robot from scratch and using an iRobot as a base instead. In the beginning I was struggling with mounting on the iRobot and it being more restricted, but then came around to the idea after more Read more…

By mkeeta, 3 years ago
Serena's Status Reports

Serena’s Status Report for 10/1/22

This week, we made an important modification to our project as a team— after speaking with Professor Mukherjee, we decided to use an iRobot as our base rather than building a robot from scratch.    Mae and I then worked on refining the pipeline for our software system, based on Read more…

By sjying, 3 years3 years ago

Posts navigation

Previous 1 2
Recent Posts
  • Serena’s Status Report for 11/10/22
  • Team Status Report for 12/10/22
  • Mae’s Status Report for 12/10/22
  • Meghana’s Status Report for 12/10/22
  • Meghana’s Status Report for 12/3/22
Recent Comments
    Archives
    • December 2022
    • November 2022
    • October 2022
    • September 2022
    Categories
    • Mae's Status Reports
    • Meghana's Status Reports
    • Serena's Status Reports
    • Uncategorized
    • Weekly Status Reports
    Meta
    • Log in
    • Entries RSS
    • Comments RSS
    • WordPress.org
    • Design Review
    • Final Project Documents
    • Introduction and Project Summary
    • Proposal
    • Weekly Status Reports
    Hestia | Developed by ThemeIsle