Tag: status report

Geronimo’s Status Report February 21

This week I made some great progress on the UI of the app. I worked on setting up the different data separation for Rally and Serving. Demonstrating how the resulting data would show up after processing. I also updated the 2d grid into a 3d grid to demonstrate the swing paths.

Progress is currently on schedule and I do not have any blockers.

This coming week I hope to keep updating the UI as needed and start working on creating calculations that will be used with the incoming data to make predictions on some of the statistics.

Geronimo’s Status Report February 14

This week I made some progress on the UI of the app. I also read through two research papers of similar projects that professor Quinn provided us. I mainly focused on the serve path part of the UI and getting more adept and understanding how to use the JS and React frameworks. I found a great resource that provides a lot of help and guidance for creating the app.

(I had a video going through the UI but the file was too large)

My progress is currently on schedule

Next week I hope to have finalized the base UI set up with some false data as well so I can start to test out how it will look properly once we have data being streamed in.

Team Status Report for 02/14/2026

We still believe that the most significant risk would be having to do with part incompatibility or taking too long to get our hands on the parts. We are mitigating this by choosing parts that are in stock on DigiKey, and also finding alternatives on Amazon where applicable. If we run into serious issues here, we can always choose different hardware components to prototype with and then switch over to the actual components we want to use for our final product later on. It is important to get data flowing as soon as possible so we can begin some initial testing, data characterization, and data analysis. An additional risk is the player experience being affected too much by our product. As of now, our team is ideating the best way to design the case so that it meets our technical requirements, while also remaining relatively discreet for the player. Some factors that lead to our concern are the necessity to keep the part light, thin, and water proof. Our current plan to mitigate this is to prototype quickly with simple, unsophisticated designs and rule out certain approaches to maximize user experience quickly. 

No changes were made to existing design of the system. At least to the hardware. We are still in the process of ironing out ML algorithms and methods that fit our use case the best. Thanks to a few papers and additional research, we have been able to select the algorithms and methods that will allow us to achieve some specific requirements, such as swing type classification and performance analysis accuracies. Specifically, we will be using Support Vector Machines to do classification, we will segment and extract features of the IMU readings before and after the impact stage to capture events, and also use a similar performance scoring system of using power and timing of different strokes. Additionally, we are focused on exploring physical prototyping for our case. But we did not have exact answers for these before so it is not a significant change. These costs are minimal.

Some of the research we analyzed to get a better idea of ML to use: paper1 , paper2

 

Mario’s Status Report for Feb 14

I personally worked on completing the design proposal slide deck that I will be presenting on Monday, Feb 16. For the proposal slide deck, I did additional research in order to garner more accurate quantitative measures for our project. For example, I calculated an approximate guess of our size of market based on comparing similar products in the golf industry. I also read and analyzed two research papers of similar projects: paper1 and paper2 which had much relevant information for us. Thanks to these papers and additional research, I have been able to select the algorithms and methods that will allow us to achieve some specific requirements, such as swing type classification accuracy and performance analysis accuracy. Specifically, we will be using Support Vector Machines to do classification, we will segment and extract features of the IMU readings before and after the impact stage to capture events, and also use a similar performance scoring system of using power and timing of strokes/serves. 

 

My progress is on schedule.

Next week, I hope to give a fantastic product design presentation. I hope to start programming the embedded device that should be arriving. I would like to test the IMU, and start receiving, processing, and transmitting data from it. Finally, I want to complete a test suite that will show metrics of the working system.

Team Status Report for 02/07/2026

We think that one of the most significant risks would be if parts have long lead times or if the ordering process takes a super long time. We are mitigating this by choosing parts that are in stock on DigiKey, and also finding alternatives on Amazon where applicable. If we run into serious issues here, we can always choose different hardware components to prototype with and then switch over to the actual components we want to use for our final product later on. It is important to get data flowing asap so we can begin some initial testing, data characterization, and data analysis. We plan to order parts early this coming week, hopefully get them in by the end of the week or early next week, and have a working hardware setup by the end of next week.

 

Some metrics could not be as easy to read as we might think, and could lead to metric calculations being poor. These risks are being managed by having the base idea for the metrics be more general or by having range values instead of giving specific values. As a contingency, we have a few other metrics that we could try to calculate instead.

No significant changes have been made, we are still working on choosing the specific hardware components, but no major changes, just part selection. 

 

No schedule updates at the moment. Still following the original schedule.

Basic UI setup has started:

Mario’s Status Report for Feb 7

I personally worked on creating the proposal presentation that we presented on Wednesday. I did additional research and brainstorming for addressing possible problems that our team my find when physically implementing our project. I’ve embedded just some of the work that I did towards planning our device.

My progress is on schedule but I have much work to do next week. I have to ensure that the correct parts are ordered and on the way and I want to start prototyping a case design.

I want to have a cad design for the case and I want to have all relevant parts ordered and on the way.