Min Ji’s Status Report for April 19

This week, I focused on repainting the left, top, and front panels as well as the letters. After painting them, I assembled all structural components, including the inner panels. The coils are not here yet, so I wasn’t able to glue them, but other than the coils, the box assembly is done.
For the software tasks, I successfully deployed the website to production at www.sweetrivia.me. The Rpi question download bug was fixed(had an incorrect Google Drive ID), and the QR code functionality on the website to link to the upload interface was attempted. I also completed preparations for the final presentation slides.

I am on track overall. The major deliverables, including the structural assembly, paintwork, website deployment, and challenge mode integration, have been completed as planned. The only issue still being resolved is the QR-code-triggered cloud download functionality on the RPi. I am planning to continue debugging into next week to ensure a seamless sync between the frontend and backend.

For the upcoming week, I plan to

  • Finalize the QR-code-based cloud download pipeline, ensuring that the RPi correctly pulls and processes the selected CSV from Google Drive
  • Prepare and present our final presentation
  • Polish UI/UX elements

 

Leave a Reply

Your email address will not be published. Required fields are marked *