Min Ji’s Status Report for April 26

This week I worked on:

  1. Finalizing final presentation slides and presented in front of the class.
  2. Assembly work on a machine with Vicky:
    • Recoil the 4 slots to right gap and length + test 20+ times
    • Glue motors back on to lower position than before
    • Reconnect wire connections
    • Glue backpanel with the side panels
    • Laser cut 8 coil holder walls
    • Laser cut plexiglass
    • Stick on LED strip
  3. Finished 1st draft and 2nd draft of final poster.
  4. Prepared for shooting final video, filmed the intro.

10 point candy motor

20 point candy motor

30 point candy motor

40 point candy motor

My progress is on schedule. I still need to finish debugging the QR-code before the final demo.

In the upcoming week, I plan to finish the poster, final video, and get ready for the final demo.