{"id":215,"date":"2025-04-06T01:19:03","date_gmt":"2025-04-06T01:19:03","guid":{"rendered":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s25-teamf3\/?p=215"},"modified":"2025-04-06T01:19:03","modified_gmt":"2025-04-06T01:19:03","slug":"moises-status-report-04-05","status":"publish","type":"post","link":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s25-teamf3\/2025\/04\/06\/moises-status-report-04-05\/","title":{"rendered":"Moises Status Report 04\/05"},"content":{"rendered":"<p class=\"\">This past week was primarily focused on preparing for and presenting at the interim demos. I made a few last-minute adjustments and ensured the capacitive touch grids were functioning as intended. Due to Carnival Week, I wasn\u2019t able to make significant visual or hands-on progress, but I did spend time planning the next steps.<\/p>\n<p class=\"\">Specifically, I began evaluating materials for the next iteration of the 9&#215;9 grid and started designing how all the components of the project will come together in a cohesive system. I also ordered acrylic sheets for laser cutting to begin prototyping an enclosure. Some initial design work has been completed for the enclosure, though it will require further iteration.<\/p>\n<p class=\"\">Goals for this upcoming week:<\/p>\n<ul>\n<li class=\"\">\n<p class=\"\">Finalize and test a properly functioning 9&#215;9 capacitive touch grid with consistent and accurate touches.<\/p>\n<\/li>\n<li class=\"\">\n<p class=\"\">Continue iterating on the overall cohesive design of the project.<\/p>\n<\/li>\n<li class=\"\">\n<p class=\"\">Review and possibly incorporate feedback received during the interim demo into the next design phase.<\/p>\n<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>This past week was primarily focused on preparing for and presenting at the interim demos. I made a few last-minute adjustments and ensured the capacitive touch grids were functioning as intended. Due to Carnival Week, I wasn\u2019t able to make significant visual or hands-on progress, but I did spend time planning the next steps. Specifically, &hellip; <\/p>\n<p class=\"link-more\"><a href=\"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s25-teamf3\/2025\/04\/06\/moises-status-report-04-05\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Moises Status Report 04\/05&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1116,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[5],"tags":[4],"_links":{"self":[{"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s25-teamf3\/wp-json\/wp\/v2\/posts\/215"}],"collection":[{"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s25-teamf3\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s25-teamf3\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s25-teamf3\/wp-json\/wp\/v2\/users\/1116"}],"replies":[{"embeddable":true,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s25-teamf3\/wp-json\/wp\/v2\/comments?post=215"}],"version-history":[{"count":1,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s25-teamf3\/wp-json\/wp\/v2\/posts\/215\/revisions"}],"predecessor-version":[{"id":216,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s25-teamf3\/wp-json\/wp\/v2\/posts\/215\/revisions\/216"}],"wp:attachment":[{"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s25-teamf3\/wp-json\/wp\/v2\/media?parent=215"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s25-teamf3\/wp-json\/wp\/v2\/categories?post=215"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s25-teamf3\/wp-json\/wp\/v2\/tags?post=215"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}