This week I have made significant progress on the camera and projector system. We have now received and assembled the pool table, allowing us to initiate testing with the camera and projector. I have conducted preliminary tests to assess calibration accuracy, image capture quality, and potential integration challenges. However, the frame for the system arrived late on Friday, preventing me from setting up the complete system. Therefore I am still a bit behind schedule, but plan to retrieve the frames from the package service and complete the setup on Monday, which will enable full system integration and more comprehensive testing.