Nadia’s Status Report for 3/8/2025

Nadia’s Status Report for 3/8/2025

I spent the bulk of the week leading up to spring break working on the design report due on Friday. I was busier than expected during spring break itself, so not much progress happened during that week. I am continuing to verify and test code on the breakout setup to prepare for flashing onto the board. Currently, the biggest concern on my end is making the code as reliable as possible and ensuring that the user control handling is robust.

I remain on schedule. The PCB is probably going to arrive soon, so I will coordinate with Sharon to come up with a test plan since she will also have to verify the PCB initially once it arrives. Until then, I will work more extensively testing on the breakout/breadboard setup to minimize potential issues during PCB testing and system integration.