Anna’s Status Report for 3/15/25

What did you personally accomplish this week on the project? Give files or photos that demonstrate your progress. Prove to the reader that you put sufficient effort into the project over the course of the week (12+ hours).

This week, I completed the ethics assignment and collaborated with my team to draft the group collaboration section. Additionally, I acted on feedback from our weekly meeting, particularly condensing our talking points into concise notes, such as further justifying our product’s size by researching and documenting studies that support ergonomic factors of our design. I also assisted Ashira with laser cutting and assembling parts of the physical enclosure. Besides this, I upgraded the RPi, installed necessary dependencies, and uploaded the GUI code to test its functionality. This test revealed that I need to adjust the display configuration as I encountered issues with the screen orientation and parts of the interface being cut off, so I also spent some time trying to fix these issues.  Additionally, I tried to help David on debugging the motor control system to ensure the team stays on track.

Is your progress on schedule or behind? If you are behind, what actions will be taken to catch up to the project schedule?

My progress is on schedule.

What deliverables do you hope to complete in the next week?

I hope to properly fit the GUI within the display by updating the current code and have some functioning peripherals.

Leave a Reply