What are the most significant risks that could jeopardize the success of the project? How are these risks being managed? What contingency plans are ready?
Currently, there are no major risks, as components are arriving on schedule. However, with spring break approaching and our schedules becoming busier, we are hoping to stay in progress. We will be trying to get as much done as we can during class time as it is ensured everyone is available.
Were any changes made to the existing design of the system (requirements, block diagram, system spec, etc)? Why was this change necessary, what costs does the change incur, and how will these costs be mitigated going forward?
Since the last status report, no changes have been made to the system design.