Completed tubing size analysis and ordered updated parts to ensure proper fit and functionality within the system for optimizing fluid flow and maintaining system efficiency.
Researched circuit connections and pinout configurations for integrating solenoid valves and robotic arms, preparing for embedded system control once the new components arrive.
Assembled the robotic arm to prepare for preliminary testing for full system integration later on.
Next Week Deliverables
Develop a working physical prototype to evaluate the feasibility of the system and identify and refine any potential adjustments.