Arda Akinci’s Weekly Status Report for 4/26/25

Personal Accomplishment

  • Since our biggest issue was leakage, we prioritized fixing that this week. I helped apply some of the substance in each valve to minimize the leakage
  • Completed a couple slides of the presentations for the final review presentation
  • Wrote the public pitch and system architecture for both the hardware and software subsystems for the final poster
  • Ran some tests to further. The tests included order random drinks from the suggestion and checking the valve accuracy. I also ran some tests to see the flow rate of the valves opening and closing produced the same output as what was desired for each order

Next Week Goals:

  •  Final Video Demo made and uploaded
  • In person presentation in Wiegand Gym
  • Final Report Written

Status: On Schedule