Howard Ma’s Weekly Status Report for 4/19/25

Personal Accomplishments

  • Planned and drilled holes in the base structure to allow tubes and wires to pass cleanly through, improving both flow control and circuit organization across the system.

 

  • Finalized the stirrer setup, establishing a fixed cup placement location to ensure proper alignment during drink mixing.

 

  • Assisted in full system testing.

Next Week Deliverables

  • Focus on system stability and reliability during extended use and tests.
  • Prepare for the final presentation and complete the final project report.

Status Report: On Schedule