Personal Accomplishments
- Planned and drilled holes in the base structure to allow tubes and wires to pass cleanly through, improving both flow control and circuit organization across the system.
- Finalized the stirrer setup, establishing a fixed cup placement location to ensure proper alignment during drink mixing.
- Assisted in full system testing.
Next Week Deliverables
- Focus on system stability and reliability during extended use and tests.
- Prepare for the final presentation and complete the final project report.