Team Status Report 3/29

Since Alan got the modules 3D printed, it seems most of our stresses are gone now. John is working on the wiring before interim demo. If this does not work, that would, as of now, the most significant risk to our interim demo seeming functional to any staff members. But we are working on it now, so hopefully it should be fine by demo time. The game is on progress, Angela has all the basic enemies finished. We just need to get end-to-end integration tested and ready for presentation.

No real big changes were made, we did end up making the module taller than I believe our design reqs stated. This was mostly for our own ease of assembly when putting electronics inside. I think we can justify this as a limitation of this being not a professional product where we would likely have the tools to assemble this easier.

Schedule is still the same.

Pictures are in individual status reports.