Project Risks & Mitigation Strategies
Our most significant risk, the arrival of the display, is officially behind us. I’m sure there’s something else that we need to keep an eye on but I really just can’t remember right now.
Changes to System Design
We may have to change how the battery is mounted on the frame from what we originally drafted, since we’ve realized that where it was would likely cause the headset to be untenably front-heavy. I haven’t figured out where it’s going to go instead, but I’m working on it.
After receiving feedback during our last check-in, Diya is going to contribute to the CAD design for the smart glasses to support Rebecca’s work on the hardware. The first printable version is complete, and we can move forward with integration in earnest.
More changes to individual contribution plans discussed in individual reports.
Schedule Progress
We always knew this upcoming week was going to be functionally unusable and we’ve done our best to work around it. There’s a bit of work that has to be done tomorrow to prep for the demo, but besides that it’s looking very light.
Next Steps:
- Begin testing the integration of all systems
- Finalize and connect the recipe database to the display
- Continue refining both software and hardware components after the interim demo
- (More immediately) Meet briefly to create a script / plan for our interim demo