Accomplishments:
This week we finished a draft of our written design review. The content I wrote specifically were the design requirements, the software diagram and description, and the software system implementation. I redesigned our software system as I did more research and identified possible risks with our previous plan, and wrote some code to start obtaining depth maps.
Progress:
We are ahead of schedule with the written design report because we will be finished with our draft by tomorrow, the 23rd. We are on schedule with the start of our project and initialization, but risk falling behind this week or next if our tasks take longer than expected or we encounter some errors with our technology. We had a later start than expected with our technology because it took longer to receive a few necessary parts we ordered, such as the microSD card.
Future deliverables:
This week we will be editing our draft of the design proposal, and hopefully by next week we will have our devices initialized and will be successfully able to obtain data from our L515 camera, start on the code to obtain and interpret depth mappings, and start working further past the Jetson initialization.