1. Personal accomplishments for the week
1.1 Integration with cloud transmission pipeline
I have continued to work with Steven on integrating the motorized camera system with the cloud infrastructure he has been using for CV inference. There are some issues with getting transmitting the image to the cloud database in addition to latency constraints that need to be met.
1.2 Testing
I have been measuring the latencies of every stage of the image stitching and transmission pipeline, in addition to the stitching reliability rates.
2. Progress status
We are on track of tasks as we prepare for the final presentation for the coming week and continue with integration.
3. Goals for the upcoming week
- Complete integration with cloud transmission pipeline (to work with Steven on this)
-
Complete integration with the smartphone application