This week our team worked on the physical housing. MM bought supplies, Taylor installed pipes, and Aneesha tested the new design. Aneesha did testing on the dispensing and MM did testing on the software application. Taylor did testing on both the hardware and software systems and spent time designing the new dispense system. Aneesha and MM worked together on testing the load cell on an arduino. The whole team worked on the presentation. The biggest challenge we faced was the load cell amplifier still not working. MM ordered another load cell amplifier, and is still waiting for it to arrive. However, at this point, it may need to be removed from the design entirely. Additionally, pills kept getting stuck in our original funnel design, so we decided to switch to a pipe-shape instead. This fixed our issue, and we have adapted our structure accordingly.