Lynn’s Status Report for 04/27

Progress

The primary task for this week is the integral testing of the whole system. I invited two volunteers to conduct the test by handing the device to them and letting them play around with the functionalities. I recorded the time interval starting from the user giving a command to the system outputting corresponding results. Another metric is the overall accuracy of the system. I counted the number of times the system provided a “Try again” output, which means the system failed to examine the command. After the testing process ended, I asked each volunteer about their comments on the design of the system and recorded their thoughts.

After the testing was finished, I cleaned up the data and discussed the results with my teammates. We would adjust the user interface design based on the feedback and present the final version on the demo day.

Schedule

I am on schedule.

Next Step

I will work with Yuxuan to design and record the final video, and write the final report and conduct the final demo with all teammates next week.

Leave a Reply

Your email address will not be published. Required fields are marked *