This Week This week I finished assembling the stage, and wrote code for the steppers. The remaning assembly included: boring out larger holes in the aluminum belt clamps, sanding down … Read More “Luca’s Status Report 4/6”
Posted in month:
April 2024
Anirud’s Status Report for 04/06
This Week: Worked with Callum and Luca to expedite the integration of the mechanical and electronic subsystems for the interim demo. I soldered and implemented the limit switches for the … Read More “Anirud’s Status Report for 04/06”