Team Status Report for 4/1

Risk and Risk Management

The major risk that we have is the physical installation of the blinds. The blinds need to be drilled into a window, but we cannot legally drill the blinds into the windows of any of our houses. Our current workaround for this is to connect the blinds to a cardboard construct and attach that construct to the windows, or wherever we want to put them. We also need command strips in order to connect the cardboard to the window, but if these do not arrive on time then we will temporarily use duct tape.

System Design Changes

As of now there hasn’t been a change to the existing design of the system.

Schedule

The schedule has not changed yet, and everyone is roughly on track for the time being.