Team Status Report for 3/25

Risk and Risk Management

The major risk that we have is related to full integration testing. Since real time testing requires the weather to be sunny and we also have other time commitments so we need the sunny day to line up with our availability to test for capstone. This makes rapid revision and testing very difficult. We aim to mitigate this by utilizing past data from sunny day to simulate a sunny day. We won’t be able to get real life confirmation but we can double check the response to what we think is the ideal response.

System Design Changes

As of now there hasn’t been a change to the existing design of the system.

Schedule

The schedule has not changed yet, and everyone is roughly on track for the time being.