KJ Newman’s Status Report for 3/11/2023

  • Work this week
    • This week, I completed our PCB design.  I did our layout and it passed all DFM checks.  It is currently in fabrication at JLCPCB and expected to arrive before class resumes after winter break.
    • I ordered all parts to make our PCB.  Our only expected expense that has not been purchased yet is 3d printer filament.  This has 1 day shipping so can be purchased later.  Setting up our part orders was a bit complex because I wanted to order with bulk discounts where possible and buy extra components in case we need them, but we are running a little close to the $600 budget.  I ultimately ordered enough active components for 3 boards and numbers of resistors and capacitors to get bulk discounts.
    • I wrote my parts of the design report.  This was a lot of work to do in parallel with finishing and ordering the PCB, but we managed to finish it.
  • Schedule
    • My parts are on schedule.  I planned on having the pcb ordered before spring break and set to arrive after spring break, and it should be here by then.
  • Deliverables
    • For next week, I plan to have 2 PCBs fully assembled and ready for use.  This should be achievable, since all of our parts will have arrived before the beginning of the week.