This week, the team worked to connect our hardware component and software component by joining the RPi and Arduino. Having both of these devices, and having each go with a … Read More “Team Status Report for Apr. 30, 2022”
slavelle
Sam Lavelle’s Status Report for Apr. 30, 2022
This week I worked with the team to combine software and hardware components into one system, and prepare our final deliverables. We met up in the lab and connected the … Read More “Sam Lavelle’s Status Report for Apr. 30, 2022”
Sam Lavelle’s Status Report for Apr. 23, 2022
This week I was out of town, so progress was again slow. However, I was able to do good work on Monday, and research some things during my trip. On … Read More “Sam Lavelle’s Status Report for Apr. 23, 2022”
Sam’s Status Report for Apr. 16, 2022
This week I wasn’t able to accomplish anything with the circuit, as I was ill. I began to feel well enough to start making up work for all my classes … Read More “Sam’s Status Report for Apr. 16, 2022”
Sam’s Status Report for Apr. 10, 2022
This week, I was able to bring the whole system together to extract the code off of a 125 kHz card. This is what I showed at our interim demo, … Read More “Sam’s Status Report for Apr. 10, 2022”
Sam Lavelle’s Status Report for Apr. 2, 2022
This week, I set out to test my circuit with 125 kHz bit tag cards. I hit a few bumps at the beginning of the week, as the circuit wasn’t … Read More “Sam Lavelle’s Status Report for Apr. 2, 2022”
Sam Lavelle’s Status Report for Mar. 26, 2022
This week I connected our circuit components and began testing. Pictures and videos have been added to the Google Drive of process pics. I was able to prove that the … Read More “Sam Lavelle’s Status Report for Mar. 26, 2022”
Sam Lavelle’s Status Report for Mar. 19, 2022
This week I collected all of our supplies that had come in and reserved a bin to hold them. We recieved our 2 RPis, RFID reader for testing, and accessory … Read More “Sam Lavelle’s Status Report for Mar. 19, 2022”
Sam Lavelle’s Status Report for Feb. 26, 2022
This week, I finished constructing our circuit on a breadboard. I also added our logo to our website and design review presentation. I’m on schedule, but anticipate a possible delay … Read More “Sam Lavelle’s Status Report for Feb. 26, 2022”
Sam Lavelle’s Status Report for Feb. 19, 2022
his week, I designed our hardware implentation and gathered/ordered all necessary supplies. Any uncertainties were fleshed out in our weekly meeting, so now it’s ready to be built! I also … Read More “Sam Lavelle’s Status Report for Feb. 19, 2022”