Team Status Report for 19 March 2022

What are the most significant risks that could jeopardize the success of the project? How are these risks being managed? What contingency plans are ready?

The most significant risk is the beamforming part of our system. To manage this risk, Charlie and Stella will be working together to get beamforming working. After discussing on Friday, Stella will look through her delay-and-sum beamforming code on Saturday, and try to separate a simulated wave on Sunday. If no bug is observed, Charlie will then come in and work with Stella to figure out the problems.

The contingency plan is a deep learning speech separation approach. Charlie has obtained significant success in using deep learning to separate speech, but the deep learning model he has used cannot be used in real-time due to processing latency. Nevertheless, it satisfy our MVP.

Were any changes made to the existing design of the system (requirements, block diagram, system spec, etc)? Why was this change necessary, what costs does the change incur, and how will these costs be mitigated going forward?

There is no change to our system design, unless we resort to a deep learning approach to separate mixed speech. This would be a discussion we will have in two weeks.

Provide an updated schedule if changes have occurred.

No change to schedule.

This is also the place to put some photos of your progress or to brag about component you got working.

The separated speech from deep learning by Charlie is worth bragging.

Mixed speech

Stella speech

Larry speech