{"id":93,"date":"2022-02-20T04:32:37","date_gmt":"2022-02-20T04:32:37","guid":{"rendered":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s22-teamb5\/?p=93"},"modified":"2022-02-27T02:31:03","modified_gmt":"2022-02-27T02:31:03","slug":"team-status-report-for-2-19","status":"publish","type":"post","link":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s22-teamb5\/uncategorized\/2022\/02\/20\/team-status-report-for-2-19\/","title":{"rendered":"Team Status Report for 2\/19"},"content":{"rendered":"<p>This week was our busiest week so far.\u00a0 We had discussions to finalize our design choices for the overall system states and architecture.\u00a0 We estimate that we are each about 70-80% finished with designing our own respective subsystems.\u00a0 We will complete our designs in time to submit the design report.\u00a0 \u00a0We have not yet documented the fabrication and assembly process of our design, which we will do in our report.\u00a0 We also have to meet again to discuss what the interfaces will be between each of the respective subsystems we are designing and also start thinking about how we will proceed with system integration.\u00a0 We have updated the Gantt chart to show our progress in our design phase.\u00a0 We added slack to our schedule to include more system integration and start our development phase when spring break starts.\u00a0 We decided Raymond will present for our Design Presentation, which is mostly finished and ready to be submitted.\u00a0 Although we are all still busy in the Design phase, it is worth noting that we should look ahead and start discussing the Development phase of this project next week.\u00a0 We hope to continue this pace throughout our project.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>This week was our busiest week so far.\u00a0 We had discussions to finalize our design choices for the overall system states and architecture.\u00a0 We estimate that we are each about 70-80% finished with designing our own respective subsystems.\u00a0 We will complete our designs in time to submit the design report.\u00a0 \u00a0We have not yet documented &hellip; <\/p>\n<p class=\"link-more\"><a href=\"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s22-teamb5\/uncategorized\/2022\/02\/20\/team-status-report-for-2-19\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Team Status Report for 2\/19&#8221;<\/span><\/a><\/p>\n","protected":false},"author":581,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[12,1],"tags":[],"_links":{"self":[{"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s22-teamb5\/wp-json\/wp\/v2\/posts\/93"}],"collection":[{"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s22-teamb5\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s22-teamb5\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s22-teamb5\/wp-json\/wp\/v2\/users\/581"}],"replies":[{"embeddable":true,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s22-teamb5\/wp-json\/wp\/v2\/comments?post=93"}],"version-history":[{"count":1,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s22-teamb5\/wp-json\/wp\/v2\/posts\/93\/revisions"}],"predecessor-version":[{"id":94,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s22-teamb5\/wp-json\/wp\/v2\/posts\/93\/revisions\/94"}],"wp:attachment":[{"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s22-teamb5\/wp-json\/wp\/v2\/media?parent=93"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s22-teamb5\/wp-json\/wp\/v2\/categories?post=93"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s22-teamb5\/wp-json\/wp\/v2\/tags?post=93"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}