Team Status Report for Feb 12, 2022

During the past week, our team mainly focused on finalizing our project design and proposal presentation. We also considered some technical challenges that we could come across while working on the project.

One main significant risk that could be posed is if the server code takes too long sending images or vectorized files, since we are unsure of how long it would take to transfer all of the data in those files from client to server to four other clients. One way to manage this risk is to make sure we have to wait until the server code is working and then test it.

Another challenge will be ensuring that we are able to accurately recreate the hand drawn image as a vectorized one. We will need to research computer vision algorithms that can recognize lines that are not perfectly straight as lines. This is something that we intend to do in the coming week.

The main thing we accomplished this week was the proposal presentation on Monday, which went very well. No changes have been made to the existing design of the system that was presented on Monday, and we are on schedule so far to complete the deliverables as laid out in the Gantt chart in the coming weeks.

Leave a Reply

Your email address will not be published. Required fields are marked *