Allen’s Status Report for April 16, 2022

  1. Completed the web application (includes some testing on user authentication, password encryption, protection from pages if you aren’t logged in, and more)
  2. Thinking about different methods for integration between the web application, the wireless transfer system (for the people detection), and Lucky’s laptop (for object detection)
  3. Playing around with integration between the three subsystems (i.e. getting one subsystem to run terminal commands from another subsystem; basically a client-server connection)

I believe that we are on track to finish and we will treat the final presentation date as a hard deadline to integrate all of the subsystems and finish testing. That would be the best case scenario, but if we do not, we will still have two weeks to finish before the final demo.

During this upcoming week, I plan to do the following:

  1. Continue integration with the three subsystems
  2. hosting web application on the cloud
  3. complete the final presentation slides
  4. Assisting Lucky and Takshsheel with anything that they need