Team Status Report for April 10, 2022.

An overview of what we did:

  • Each team member presented at the interim demo, received feedback and carried that into the remaining work for our project.
  • Each member worked on individual subsystems for our pre-integration project.

In terms of what we will do this upcoming week, we hope to do the following:

  • Complete the purchases/manufacture required for our physical space and system (shelf, camera locations, items, etc)
  • Begin the process of having our scripts recognized by and running on the raspberry pi, and also test the integration by making different requests at different times.

 

The most significant risks that we know of thus far are:

  • Different designs of our system (Takshsheel’s idea for the camera) and also integration of the local machine work into one system. 
  • Completion of our subsystems which is so far on point, however, bugs that are hard to debug could possibly cause serious troubles for completion. It’s not a guarantee, but it is likely we’ll see something of that nature, and it would be critical to solve it at the earliest when that happens. 

 

Changes To our schedule

  • There are no new changes to our schedule since the interim demo.