Allen’s Status Report for April 2, 2022

  1. Met with our group, TA, and professor to discuss the status of our project and talked about what to expect for the upcoming interim demo
  2. Added a global data set to the web application as well as a view for new users to pick items they want analyzed by the object detection algorithm

I believe that our progress is behind. With roughly 3 weeks left, I think that we have our work cut out for us. During carnival, I plan to do lots of work and I want our team to start fully integrating and testing our systems with two weeks to go to be safe.

During this upcoming week, I plan to do the following:

  1. Continue researching web sockets as that is a potential bridge that will allow our subsystems to connect with each other (for integration) (besides hosting the web application on the cloud)
  2. Continue making progress on the web application to be ready for integration next week (hopefully)
  3. Discuss what/how to present our interim demo (Sunday night)
  4. Figuring out how to set up our system and shelf/items
    1. i.e. will probably need to buy/find/make a shelf
  5. Assisting Lucky and Takshsheel with anything that they need