{"id":165,"date":"2021-04-11T02:54:07","date_gmt":"2021-04-11T02:54:07","guid":{"rendered":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teame7\/?p=165"},"modified":"2021-04-11T02:54:07","modified_gmt":"2021-04-11T02:54:07","slug":"ethans-status-report-4-10-2021","status":"publish","type":"post","link":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teame7\/2021\/04\/11\/ethans-status-report-4-10-2021\/","title":{"rendered":"Ethan&#8217;s Status Report &#8211; 4\/10\/2021"},"content":{"rendered":"<p>This week I finished the PCB design! I have a minor change I need to make regarding the input resistance on the base of BJT controlling the LEDs but otherwise it should be good to go! Currently looking to have it fabricated early next week from OSHPark. Based on their lead times and shipping estimates, we should have it by next week for integration into our project (replacing our prototype protoboard).<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"size-medium wp-image-171 alignnone\" src=\"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teame7\/wp-content\/uploads\/sites\/157\/2021\/04\/Capture-300x221.png\" alt=\"\" width=\"300\" height=\"221\" srcset=\"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teame7\/wp-content\/uploads\/sites\/157\/2021\/04\/Capture-300x221.png 300w, http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teame7\/wp-content\/uploads\/sites\/157\/2021\/04\/Capture-768x565.png 768w, http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teame7\/wp-content\/uploads\/sites\/157\/2021\/04\/Capture.png 998w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n<p>We also had some issues with our camera module this week that we diagnosed as a hardware defect and have since shipped it back and received a new one. Hopefully, we don&#8217;t run into any more issues with the camera!<\/p>\n","protected":false},"excerpt":{"rendered":"<p>This week I finished the PCB design! I have a minor change I need to make regarding the input resistance on the base of BJT controlling the LEDs but otherwise it should be good to go! Currently looking to have it fabricated early next week from OSHPark. Based on their lead times and shipping estimates, &hellip; <\/p>\n<p class=\"link-more\"><a href=\"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teame7\/2021\/04\/11\/ethans-status-report-4-10-2021\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Ethan&#8217;s Status Report &#8211; 4\/10\/2021&#8221;<\/span><\/a><\/p>\n","protected":false},"author":484,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[8],"tags":[],"_links":{"self":[{"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teame7\/wp-json\/wp\/v2\/posts\/165"}],"collection":[{"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teame7\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teame7\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teame7\/wp-json\/wp\/v2\/users\/484"}],"replies":[{"embeddable":true,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teame7\/wp-json\/wp\/v2\/comments?post=165"}],"version-history":[{"count":1,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teame7\/wp-json\/wp\/v2\/posts\/165\/revisions"}],"predecessor-version":[{"id":172,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teame7\/wp-json\/wp\/v2\/posts\/165\/revisions\/172"}],"wp:attachment":[{"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teame7\/wp-json\/wp\/v2\/media?parent=165"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teame7\/wp-json\/wp\/v2\/categories?post=165"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teame7\/wp-json\/wp\/v2\/tags?post=165"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}