{"id":141,"date":"2021-04-11T02:06:19","date_gmt":"2021-04-11T02:06:19","guid":{"rendered":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teamd0\/?p=141"},"modified":"2021-04-11T02:06:19","modified_gmt":"2021-04-11T02:06:19","slug":"adams-status-report-for-4-10-2021","status":"publish","type":"post","link":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teamd0\/2021\/04\/11\/adams-status-report-for-4-10-2021\/","title":{"rendered":"Adam&#8217;s Status Report for 4\/10\/2021"},"content":{"rendered":"<p>REV 2 FABRICATION: As we continue the process of bringing up the Rev 1 PCB and developing appropriate software, I am recording errata to inform the updates that will become the Rev 2 board. So far the only major errata is a mis-connection of one of the LCD pins which incorrectly sets the mode to serial instead of parallel. The target to finalize the Rev 2 design was 4\/9\/2021, but we pushed it back to the middle of the upcoming week to allow more time for verification on the Rev 1 hardware. Due to the overall excellent performance of the two Rev 1 boards, this should not significantly impact our schedule.<\/p>\n<p>REV 1 BRINGUP: This week, I played a major role in supporting the bringup of the remaining peripherals on Rev 1. I helped Xingran to properly set up and communicate with the ADC, and I helped Sam properly set up and communicate with the LCD screen. At this point, essentially all of the peripherals are functional; the only somewhat undetermined element on the critical path is communication with \/ programming the BM83, but new programming hardware should allow us to resolve this shortly.<\/p>\n<p>In the coming week, I will continue to assist with hardware bringup and simultaneously complete the mechanical design for the &#8220;BARI BOX&#8221;.<\/p>\n<p>Working on the LCD with Sam:<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-142\" src=\"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teamd0\/wp-content\/uploads\/sites\/141\/2021\/04\/Capstone_Lab_Work-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teamd0\/wp-content\/uploads\/sites\/141\/2021\/04\/Capstone_Lab_Work-300x225.jpg 300w, http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teamd0\/wp-content\/uploads\/sites\/141\/2021\/04\/Capstone_Lab_Work-768x576.jpg 768w, http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teamd0\/wp-content\/uploads\/sites\/141\/2021\/04\/Capstone_Lab_Work-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>REV 2 FABRICATION: As we continue the process of bringing up the Rev 1 PCB and developing appropriate software, I am recording errata to inform the updates that will become the Rev 2 board. So far the only major errata is a mis-connection of one of the LCD pins which incorrectly sets the mode to &hellip; <\/p>\n<p class=\"link-more\"><a href=\"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teamd0\/2021\/04\/11\/adams-status-report-for-4-10-2021\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Adam&#8217;s Status Report for 4\/10\/2021&#8221;<\/span><\/a><\/p>\n","protected":false},"author":435,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[7],"tags":[2],"_links":{"self":[{"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teamd0\/wp-json\/wp\/v2\/posts\/141"}],"collection":[{"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teamd0\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teamd0\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teamd0\/wp-json\/wp\/v2\/users\/435"}],"replies":[{"embeddable":true,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teamd0\/wp-json\/wp\/v2\/comments?post=141"}],"version-history":[{"count":1,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teamd0\/wp-json\/wp\/v2\/posts\/141\/revisions"}],"predecessor-version":[{"id":143,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teamd0\/wp-json\/wp\/v2\/posts\/141\/revisions\/143"}],"wp:attachment":[{"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teamd0\/wp-json\/wp\/v2\/media?parent=141"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teamd0\/wp-json\/wp\/v2\/categories?post=141"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teamd0\/wp-json\/wp\/v2\/tags?post=141"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}