{"id":215,"date":"2021-04-04T02:43:32","date_gmt":"2021-04-04T02:43:32","guid":{"rendered":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teamc6\/?p=215"},"modified":"2021-04-04T02:43:51","modified_gmt":"2021-04-04T02:43:51","slug":"tates-status-report-for-4-3","status":"publish","type":"post","link":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teamc6\/2021\/04\/04\/tates-status-report-for-4-3\/","title":{"rendered":"Tate&#8217;s Status Report for 4\/3"},"content":{"rendered":"<p>This week I spent the majority of my time working on building the exterior shell for our project. I ordered and picked up wood from Home Depot and had the wood cut to the specific sizes needed to build the exterior. I spent a few days this week in the Techspark wood shop putting together the pieces of our exterior. I also used the laser cutter to cut out smaller pieces of wood needed for the box. I adjusted some of the designs for the mechanism as well because Jessica and I found out that we will need a little more room within the box to be \u00a0able to properly house our mechanism. I also used Jessica&#8217;s Solidworks models of 2 mechanism components and had those 3D printed to be able to fit our bigger gear. Putting together the box has been a bit more challenging than expected because I want to be sure that we are able to put our sensor platform in the box and wire everything without too much difficulty.<\/p>\n<p>I am mostly on track as long as I am able to finish putting the entire exterior together this week and integrate the sensor platform into the shell.<\/p>\n<p>In the next week, I will be finishing up the exterior and making adjustments as needed so that our box can properly fit our mechanism as intended. I will be working with Jessica and Lauren to integrate the entire system as well.<\/p>\n<div id=\"accel-snackbar\"><\/div>\n","protected":false},"excerpt":{"rendered":"<p>This week I spent the majority of my time working on building the exterior shell for our project. I ordered and picked up wood from Home Depot and had the wood cut to the specific sizes needed to build the exterior. I spent a few days this week in the Techspark wood shop putting together &hellip; <\/p>\n<p class=\"link-more\"><a href=\"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teamc6\/2021\/04\/04\/tates-status-report-for-4-3\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Tate&#8217;s Status Report for 4\/3&#8221;<\/span><\/a><\/p>\n","protected":false},"author":425,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[4],"tags":[2],"_links":{"self":[{"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teamc6\/wp-json\/wp\/v2\/posts\/215"}],"collection":[{"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teamc6\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teamc6\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teamc6\/wp-json\/wp\/v2\/users\/425"}],"replies":[{"embeddable":true,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teamc6\/wp-json\/wp\/v2\/comments?post=215"}],"version-history":[{"count":2,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teamc6\/wp-json\/wp\/v2\/posts\/215\/revisions"}],"predecessor-version":[{"id":217,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teamc6\/wp-json\/wp\/v2\/posts\/215\/revisions\/217"}],"wp:attachment":[{"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teamc6\/wp-json\/wp\/v2\/media?parent=215"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teamc6\/wp-json\/wp\/v2\/categories?post=215"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teamc6\/wp-json\/wp\/v2\/tags?post=215"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}