{"id":153,"date":"2021-05-01T21:41:59","date_gmt":"2021-05-02T02:41:59","guid":{"rendered":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teamc2\/?p=153"},"modified":"2021-05-01T21:41:59","modified_gmt":"2021-05-02T02:41:59","slug":"vrishabs-status-report-for-05-01-2021","status":"publish","type":"post","link":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teamc2\/2021\/05\/01\/vrishabs-status-report-for-05-01-2021\/","title":{"rendered":"Vrishab&#8217;s Status Report for 05\/01\/2021"},"content":{"rendered":"<p><strong>Integration<\/strong><\/p>\n<p>I spent a considerable amount of time this week working on the integration between our vision system and the rest of our processing pipeline. The image code interfaces with a web camera and the overlay is produced by opencv. The vision script receives data over UDP that is used to plot the colors for the overlay.<\/p>\n<p><strong>Testing<\/strong><\/p>\n<p>I developed a final set of tests and benchmarks that we are in the process of performing so that we have some concrete metrics and data to present. Enock and I carefully measured and placed markers around our lab environment so that the data we get can be matched against the position of the transmitting device.<\/p>\n<p><strong>Footage and Documentation<\/strong><\/p>\n<p>I spent some time this week documenting our testing process and collecting footage that will be used in our final presentation and in our slide deck.<\/p>\n<p><strong>Progress Since Last Week<\/strong><\/p>\n<p>We have completed the integration of our vision system and have moved into the final testing phase.<\/p>\n<p><strong>Tasks for Next Week<\/strong><\/p>\n<p>We plan on performing further tests, collecting data and performance metrics, and collating the footage for our final presentation.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Integration I spent a considerable amount of time this week working on the integration between our vision system and the rest of our processing pipeline. The image code interfaces with a web camera and the overlay is produced by opencv. The vision script receives data over UDP that is used to plot the colors for &hellip; <\/p>\n<p class=\"link-more\"><a href=\"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teamc2\/2021\/05\/01\/vrishabs-status-report-for-05-01-2021\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Vrishab&#8217;s Status Report for 05\/01\/2021&#8221;<\/span><\/a><\/p>\n","protected":false},"author":414,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[5],"tags":[3],"_links":{"self":[{"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teamc2\/wp-json\/wp\/v2\/posts\/153"}],"collection":[{"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teamc2\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teamc2\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teamc2\/wp-json\/wp\/v2\/users\/414"}],"replies":[{"embeddable":true,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teamc2\/wp-json\/wp\/v2\/comments?post=153"}],"version-history":[{"count":1,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teamc2\/wp-json\/wp\/v2\/posts\/153\/revisions"}],"predecessor-version":[{"id":154,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teamc2\/wp-json\/wp\/v2\/posts\/153\/revisions\/154"}],"wp:attachment":[{"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teamc2\/wp-json\/wp\/v2\/media?parent=153"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teamc2\/wp-json\/wp\/v2\/categories?post=153"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s21-teamc2\/wp-json\/wp\/v2\/tags?post=153"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}