{"id":155,"date":"2020-04-11T20:09:03","date_gmt":"2020-04-11T20:09:03","guid":{"rendered":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s20-teamb7\/?p=155"},"modified":"2020-04-08T15:38:36","modified_gmt":"2020-04-08T15:38:36","slug":"maxines-status-update-for-04-12","status":"publish","type":"post","link":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s20-teamb7\/2020\/04\/11\/maxines-status-update-for-04-12\/","title":{"rendered":"Maxine&#8217;s Status Update for 04\/12"},"content":{"rendered":"<p>This week I worked on the rest of the timing belt assembly for the Y-axis, and the full chassis frame. I added features such as the camera mount, the lights for a stable lighting condition, and the compartments for the sorted resistors. I have also begun to integrate the Z components that Claire has been working on. Here is the progress I&#8217;ve made so far:<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-full wp-image-158\" src=\"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s20-teamb7\/wp-content\/uploads\/sites\/89\/2020\/04\/chassis.gif\" alt=\"\" width=\"570\" height=\"511\" \/><\/p>\n<p>Since I&#8217;ve had a lot of time to work on capstone during this quarantine, we&#8217;ve made significant progress and I am currently on track of our Gantt chart &#8211; the start on integration even places us ahead of schedule. Once Claire finishes working on the gripper and Z components, I will integrate it to my components and we should have completed the simulation of our original robotics system.<\/p>\n<p>Once I finish integrating, I will start exploring what analysis tools Fusion360 has to offer so we can use them as basis for our testing. Hopefully, I can begin the analysis portion next week.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>This week I worked on the rest of the timing belt assembly for the Y-axis, and the full chassis frame. I added features such as the camera mount, the lights for a stable lighting condition, and the compartments for the sorted resistors. I have also begun to integrate the Z components that Claire has been working on. Here is the progress I&#8217;ve made so far: Since I&#8217;ve had a lot of time to work on capstone during this quarantine, we&#8217;ve&#8230;<\/p>\n<p class=\"read-more\"><a class=\"btn btn-default\" href=\"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s20-teamb7\/2020\/04\/11\/maxines-status-update-for-04-12\/\"> Read More<span class=\"screen-reader-text\">  Read More<\/span><\/a><\/p>\n","protected":false},"author":272,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[5,2],"tags":[],"_links":{"self":[{"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s20-teamb7\/wp-json\/wp\/v2\/posts\/155"}],"collection":[{"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s20-teamb7\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s20-teamb7\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s20-teamb7\/wp-json\/wp\/v2\/users\/272"}],"replies":[{"embeddable":true,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s20-teamb7\/wp-json\/wp\/v2\/comments?post=155"}],"version-history":[{"count":3,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s20-teamb7\/wp-json\/wp\/v2\/posts\/155\/revisions"}],"predecessor-version":[{"id":159,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s20-teamb7\/wp-json\/wp\/v2\/posts\/155\/revisions\/159"}],"wp:attachment":[{"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s20-teamb7\/wp-json\/wp\/v2\/media?parent=155"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s20-teamb7\/wp-json\/wp\/v2\/categories?post=155"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s20-teamb7\/wp-json\/wp\/v2\/tags?post=155"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}