{"id":125,"date":"2020-02-21T19:34:24","date_gmt":"2020-02-21T19:34:24","guid":{"rendered":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s20-teamb0\/?p=125"},"modified":"2020-02-21T19:34:24","modified_gmt":"2020-02-21T19:34:24","slug":"abhas-status-report-for-feb-22","status":"publish","type":"post","link":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s20-teamb0\/2020\/02\/21\/abhas-status-report-for-feb-22\/","title":{"rendered":"Abha&#8217;s Status Report for Feb 22"},"content":{"rendered":"<p>The first thing I did this week was work with Jade to determine the communication protocols between all of the hardware in this project. After we determined them, I created the system architecture diagram for our design report\/presentation and for future reference.<\/p>\n<p>This week, my goal previously was to work on the displays and Raspberry Pis. However, since all of our parts hadn&#8217;t come in yet and we were having issues with setting up the Raspis, I pivoted my focus to designing the overall robot and robot arm. After I finished designing them, I started CADing the robot arm. Since I&#8217;m a bit rusty on mechanical design and CAD, this process has taken a bit more time than I anticipated.<\/p>\n<p>I also worked on the design presentation and design report. I finished working on the design presentation and made significant progress on the report, which should reduce the amount of time I spend on it next week and let me focus on the actual project.<\/p>\n<p>So far, I am on schedule. My goals for next week are to finish the design report, finish CADing the robot arm, and work on the displays\/Raspi system. I would like to pivot back to the displays because they are more essential to the project than the robot arm.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The first thing I did this week was work with Jade to determine the communication protocols between all of the hardware in this project. After we determined them, I created the system architecture diagram for our design report\/presentation and for future reference. This week, my&nbsp;<a class=\"read-more\" href=\"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s20-teamb0\/2020\/02\/21\/abhas-status-report-for-feb-22\/\">&hellip;<\/a><\/p>\n","protected":false},"author":250,"featured_media":117,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[5,2],"tags":[],"_links":{"self":[{"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s20-teamb0\/wp-json\/wp\/v2\/posts\/125"}],"collection":[{"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s20-teamb0\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s20-teamb0\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s20-teamb0\/wp-json\/wp\/v2\/users\/250"}],"replies":[{"embeddable":true,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s20-teamb0\/wp-json\/wp\/v2\/comments?post=125"}],"version-history":[{"count":1,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s20-teamb0\/wp-json\/wp\/v2\/posts\/125\/revisions"}],"predecessor-version":[{"id":126,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s20-teamb0\/wp-json\/wp\/v2\/posts\/125\/revisions\/126"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s20-teamb0\/wp-json\/wp\/v2\/media\/117"}],"wp:attachment":[{"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s20-teamb0\/wp-json\/wp\/v2\/media?parent=125"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s20-teamb0\/wp-json\/wp\/v2\/categories?post=125"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s20-teamb0\/wp-json\/wp\/v2\/tags?post=125"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}