{"id":161,"date":"2019-03-30T23:39:34","date_gmt":"2019-03-31T04:39:34","guid":{"rendered":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s19-teamaa\/?p=161"},"modified":"2019-04-13T22:09:28","modified_gmt":"2019-04-14T03:09:28","slug":"status-report-03-30-zbp","status":"publish","type":"post","link":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s19-teamaa\/2019\/03\/30\/status-report-03-30-zbp\/","title":{"rendered":"Status Report 03-30 (zbp)"},"content":{"rendered":"<p><span style=\"font-weight: 400\">My accomplishments this week:<\/span><\/p>\n<ul>\n<li style=\"list-style-type: none\">\n<ul>\n<li>Worked on updating Revision 1 for ordering by Monday<\/li>\n<li>Tested CAN bridging with Stan (confirmed working, some latent problems such as intermittent connection stalls)<\/li>\n<li>Helped Stan debug garbage coming over-the-air (ended up being a misreading of the encoder interface)<\/li>\n<li>Screenshots of layup pending final version<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p>Note: Next week I will largely be waiting for the revision 2 boards to come in, which means I&#8217;ll spend the back half of the week playing around with Stan with UDP, possibly doing range testing in a few other radio configurations.<\/p>\n<p>My personal deliverables for next week:<\/p>\n<ul>\n<li>Status on having ordered BOM and gerbers by Monday<\/li>\n<\/ul>\n<p>Updates on last week&#8217;s deliverables:<\/p>\n<ul>\n<li>Revision 2 nearly orderable, just have to finish routing the replaced connectors (also need to investigate why PCBway is reporting the existence of a 5mil neck somewhere in my pours)<\/li>\n<li>Settled on single breakout for UART lines @ 100mil pitch<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>My accomplishments this week: Worked on updating Revision 1 for ordering by Monday Tested CAN bridging with Stan (confirmed working, some latent problems such as intermittent connection stalls) Helped Stan debug garbage coming over-the-air (ended up being a misreading of the encoder interface) Screenshots of layup pending final version Note: Next week I will largely &hellip; <a href=\"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s19-teamaa\/2019\/03\/30\/status-report-03-30-zbp\/\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Status Report 03-30 (zbp)<\/span><\/a><\/p>\n","protected":false},"author":71,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[3],"tags":[],"_links":{"self":[{"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s19-teamaa\/wp-json\/wp\/v2\/posts\/161"}],"collection":[{"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s19-teamaa\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s19-teamaa\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s19-teamaa\/wp-json\/wp\/v2\/users\/71"}],"replies":[{"embeddable":true,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s19-teamaa\/wp-json\/wp\/v2\/comments?post=161"}],"version-history":[{"count":1,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s19-teamaa\/wp-json\/wp\/v2\/posts\/161\/revisions"}],"predecessor-version":[{"id":163,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s19-teamaa\/wp-json\/wp\/v2\/posts\/161\/revisions\/163"}],"wp:attachment":[{"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s19-teamaa\/wp-json\/wp\/v2\/media?parent=161"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s19-teamaa\/wp-json\/wp\/v2\/categories?post=161"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/s19-teamaa\/wp-json\/wp\/v2\/tags?post=161"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}