Team Status Report: Week 11

Risks and Contingencies The IR receivers are sensitive to sunlight, so too much sunlight in our demo space on Monday may cause the cars to receive false hits. We are going to cover the sides of the IR LEDs on

rselagam May 4, 2019May 4, 2019 Team Reports No Comments Read more

Team Status Report: Week 10

Risks and Contingencies Latency of the video stream and control spikes frequently when there are many people connected to the router. A possible solution would be to use our own router for a network with only our devices connected, but

dzy April 27, 2019 Team Reports No Comments Read more

Team Status Report: Week 9

Risks and Contingencies No new risks were identified this week Changes to Design The game now requires user to slow down when passing over gates. We realize that this isn’t the best feature, but it seems to be the only

rselagam April 20, 2019 Team Reports No Comments Read more

Team Status Report: Week 8

Risks and Contingencies No new risks were identified this week Changes to Design No changes to design were made this week Schedule Update This week Bujji and Sourav did not have tasks scheduled due to Booth but both were slightly

dzy April 13, 2019 Team Reports No Comments Read more

Team Status Report: Week 7

Risks and Contingencies The RFID latency is an issue we must solve.  We are looking into either improving the size of our tags or finding a higher performance RFID reader. Shakiness of the camera feed is an issue. We are

rselagam April 6, 2019April 6, 2019 Team Reports No Comments Read more

Team Status Report: Week 6

Risks and Contingencies The RFID latency is still an issue, but it is something we have decided to address to after the midpoint demo on Wednesday. Latency on the video doesn’t seem to be optimizable at all. With basic Vuforia,

rselagam March 30, 2019 Team Reports No Comments Read more

Team Status Report: Week 5

Risks and Contingencies Realized that the RFID scanner we got may not be fast enough. Might not have enough GPIO pins on the rpi to be able to do everything we want to do. As a possible solution, we can

rselagam March 24, 2019 Team Reports No Comments Read more

Team Status Report: Week 4

Risks and Contingencies No new risks were identified this week. Camera stabilization and latency still remain our biggest risk factors and challenges. Changes to Design No major design changes were made this week. Schedule Update A little behind on our

rselagam March 9, 2019March 9, 2019 Team Reports No Comments Read more

Team Status Report: Week 3

Risks and Contingencies No new risks were identified this week. Camera stabilization and latency still remain our biggest risk factors and challenges. Changes to Design No design changes were made this week. Schedule Update No immediate schedule changes have occurred,

dzy March 3, 2019March 3, 2019 Team Reports No Comments Read more

Team Status Report: Week 2

Risks and Contingencies Identified that camera stabilization will be a significant issue for our project. We decided to add both hardware and software counter-measures to the project in order to mitigate this hazard with a stabilization rig using rubber bands

rselagam February 24, 2019March 3, 2019 Team Reports No Comments Read more
  • « Previous

Categories

  • Bujji's Reports
  • David's Reports
  • Sourav's Reports
  • Team Reports
  • Uncategorized

Archives

  • May 2019
  • April 2019
  • March 2019
  • February 2019
  • January 2019
Copyright © 2025 ARio Kart. All rights reserved. Theme Spacious by ThemeGrill. Powered by: WordPress.