Author: rselagam

Bujji’s Status Report: Week 12

Week of May 5 – May 11 Administrivia Prepared the final report Prepared for the final demo Cleaned up our lab space

rselagam May 11, 2019 Bujji's Reports No Comments Read more

Team Status Report: Week 11

Risks and Contingencies The IR receivers are sensitive to sunlight, so too much sunlight in our demo space on Monday may cause the cars to receive false hits. We are going to cover the sides of the IR LEDs on

rselagam May 4, 2019May 4, 2019 Team Reports No Comments Read more

Bujji’s Status Report: Week 11

Week of Apr 28 – May 4 Administrivia N/a Project This week I was able to complete most of the tasks I had said I was going to do last week: Fix the IR circuits to have pull down resistors

rselagam May 4, 2019 Bujji's Reports No Comments Read more

Bujji’s Status Report: Week 10

Week of Apr 21 – Apr 27 Administrivia Had our in lab demo on Wednesday where we showed most of our system works (RFID, car to car one-way IR blast, gameplay and item usage). Spent most of Saturday working on

rselagam April 27, 2019April 27, 2019 Bujji's Reports No Comments Read more

Team Status Report: Week 9

Risks and Contingencies No new risks were identified this week Changes to Design The game now requires user to slow down when passing over gates. We realize that this isn’t the best feature, but it seems to be the only

rselagam April 20, 2019 Team Reports No Comments Read more

Bujji’s Status Report: Week 9

Week of Apr 14 – Apr 20 Administrivia Made preparations for the in lab demo on Monday. Project I did a lot this past week in order to catch up fro the week I did not too much before (build

rselagam April 20, 2019 Bujji's Reports No Comments Read more

Bujji’s Status Report: Week 8

Week of Apr 7 – Apr 13 Administrivia N/a Project Worked on other things (as part of the schedule for build week). Thought about how to make the IR better, as well as ways to improve on the RFID. Scheduling

rselagam April 14, 2019April 20, 2019 Bujji's Reports No Comments Read more

Team Status Report: Week 7

Risks and Contingencies The RFID latency is an issue we must solve.  We are looking into either improving the size of our tags or finding a higher performance RFID reader. Shakiness of the camera feed is an issue. We are

rselagam April 6, 2019April 6, 2019 Team Reports No Comments Read more

Bujji’s Status Report: Week 7

Week of Mar 30 – Apr 6 Administrivia Worked to to put together a cohesive product to demo for the mid-point demo on Wednesday. Had to remake our schedule for the mid-point demo. Worked on the reading assignment dues this

rselagam April 6, 2019April 20, 2019 Bujji's Reports No Comments Read more

Team Status Report: Week 6

Risks and Contingencies The RFID latency is still an issue, but it is something we have decided to address to after the midpoint demo on Wednesday. Latency on the video doesn’t seem to be optimizable at all. With basic Vuforia,

rselagam March 30, 2019 Team Reports No Comments Read more
  • « Previous

Categories

  • Bujji's Reports
  • David's Reports
  • Sourav's Reports
  • Team Reports
  • Uncategorized

Archives

  • May 2019
  • April 2019
  • March 2019
  • February 2019
  • January 2019
Copyright © 2025 ARio Kart. All rights reserved. Theme Spacious by ThemeGrill. Powered by: WordPress.