Bujji’s Status Report: Week 1

Week (Feb 10 – Feb 16) Worked out most of the bill of materials: IR Circuit: Researched how to improve the range of a traditional IR sensor and arrived at the below circuit (found at https://www.electroschematics.com/6114/long-range-ir-transmitter/). Circuit below can reach

rselagam February 24, 2019 Bujji's Reports No Comments Read more

Team Status Report: Week 2

Risks and Contingencies Identified that camera stabilization will be a significant issue for our project. We decided to add both hardware and software counter-measures to the project in order to mitigate this hazard with a stabilization rig using rubber bands

rselagam February 24, 2019March 3, 2019 Team Reports No Comments Read more

Status Report Week 2: Sourav

This past week I accomplished several things with respect to the capstone project. I continued to play around with the pi cameras to understand their functionality and what they were capable of. I did extended research into the output format

souravp February 24, 2019March 2, 2019 Sourav's Reports No Comments Read more

David’s Status Report: Week 2

Progress: This week I continued my work with learning Unity by finding and modifying game assets (3d models, textures, etc.) for the items we plan to include in our game. To the right is an image showing a sample scene

dzy February 24, 2019February 24, 2019 David's Reports No Comments Read more

Bujji’s Status Report: Week 2

Week of Feb 17 – Feb 23 Finalized design of IR transmitter and receiver. Met with Professor Mukherjee and had him review and approve of both of the circuits. Continued work on the model of the car. Almost all features

rselagam February 24, 2019February 24, 2019 Bujji's Reports No Comments Read more

Team Report: Week 1

Risks and Contingencies The CMU wifi networks may not give connected devices public ip addresses, which could force us to change our network architecture to meet latency requirements. We’re looking into it more this week. In the worst case we’ll

souravp February 20, 2019 Team Reports No Comments Read more

Sourav’s Status Report: Week 1

This past week I accomplished several things with respect to the capstone project. For development purposes, I temporarily obtained a pair of raspberry pi cameras to test their functionality. Reading through the API, I was able to get the raspberry

souravp February 20, 2019 Sourav's Reports No Comments Read more

Categories

  • Bujji's Reports
  • David's Reports
  • Sourav's Reports
  • Team Reports
  • Uncategorized

Archives

  • May 2019
  • April 2019
  • March 2019
  • February 2019
  • January 2019
Copyright © 2025 ARio Kart. All rights reserved. Theme Spacious by ThemeGrill. Powered by: WordPress.