Team Status Report for 11/15/2025

Accomplishments

  • Hardware Upgrades: Replaced previous PSU with higher-wattage power supply for full-load heater testing

    300W PSU on Testbed
  • Testing & Data Collection: Began running automated test patterns including ramp up, ramp down, spike, and multi-level hold profiles
    • Completed synthetic data collection patterns covering full power range (20-80W)
  • CPU Power Trace: Collected power trace from a laptop using HWiNFO to generate realistic workload profile for testbed
Updated Testbed Assembly

Significant Risks

  • Interference from Other Classes: Embedded systems class is storing large boxes directly in front of testbed’s intake fan area
    • Obstructions may alter airflow, reduce heat dissipation, and affect temperature sensor readings
    • Risk mitigation: Hope that embedded will move boxes soon
Amazon Boxes Blocking Testbed Fan

Design Changes

  • No major design changes this week

Schedule Changes

  • Project remains on track
    • Synthetic data collection now complete for normal operation
    • Running real traces