This week, I assisted with the testbed assembly by threading the holes required to mount the resistors to the aluminum mounting board. I also ensured the resistors would make sufficient contact by sanding the part and utilizing a countersink to get rid of excess metal post threading. Additionally, I assisted with pwm testing to ensure the fan and motors had control through the pico.
The schedule is currently on track and should allow us to move forward with further integration next week.
Next week, I plan to assist with various integration needs and ensure the testbed is fully constructed and the control loop is completly finalized.
