Kristina’s Status Report for 11/01/2025

Testbed Assembly

  • Assembled the basic testbed and power routing
  • Brainstormed alternative ways to mount pump
Partial Assembly

Schedule & Progress

  • Slightly behind schedule due to fit issues with the pump mount
    • Mounting holes did not align
  • Exploring alternative mounting solutions to get back on schedule

Next Steps

  • Complete water loop assembly with tubing
  • Begin SSR PWM control testing with Pico once loop is complete
  • Add resistor and water block assembly for load simulation